JCB
Jaipur, Rajasthan
Year: 2014
Scope:
- HSD Automation project
- Fire safe automation of transport of Diesel Yard to Shop
- Completely fire safe and nonelectrical system
- Executed with Legris India Pvt. Ltd
- Project Cost- 7Cr
Indian Railways
Raebareli, Uttar Pradesh
Year: 2015
Scope:
- 50 kms of pipeline network installed35 bar N2, O2, Argon, Compressed Air and Cryogenic Installations
- Executed with Legris India Pvt. Ltd
- Project Cost- 38 Cr
Vardhaman
Spinning Mill
Mandideep, Madhya Pradesh
Year: 2019
Scope:
- SITC of SS piping network for utilities up to 20” Dia at height
- Pipe Dia's for, 1"NB to 20"BC
- Executed with Legris India Pvt. Ltd
- Project Cost- 4 Cr
Rail Coach Factory
Kapurthala, Punjab
Year: 2019
Scope:
- Compressed Air Pipeline- 1”NB to 6” NB Pipeline 15 kilometer of Pipe Network
- Executed with Laminar Industries
- Project Cost- 10 Cr
Rail Coach Factory
Kapurthala, Punjab
Year: 2019
Scope:
- of high pressure (35 bar) N2 gas to plant stored in liquid cryogenic form
- End use application of plasma cutting with all complainces managed in house
- Executed with Laminar Industries
- Project Cost- 6 Cr
RVNL
Vishakhapattnam, Andhra Pradesh
Year:2020
Scope:
- SS 316L, SS 304L Electropolished Pipeline Fabrication
- Pneumatic Pipelines & Gas manifold systems
- Project Cost - 2.8 Cr
TATA HITACHI
Kharagpur, West Bengal
Year: 2021
Scope:
- Fire Hydrant Installation
- 4+ kilometer of Network
- Retrofitting of corroded hydrants
- Project Cost- 2 Cr
Escorts Kubota
Faridabad, Haryana
Year: 2025
Scope:
- Retrofitting old cooling water lines
- Setting up compressed air network in engine test shop
- ETP, STP, flushing water & pumps setup
- Project cost – 3.2 Cr
Reliance Bio Energy
Jabalpur, Madhya Pradesh
Year:2025
Scope:
- Installation of SS & CS pipes from 2” to 32” dia
- Project commissioned in record time
- Project Cost – 1 Cr
Micron Semi-conductors
Sanand, Gujarat
Year: 2025
Scope:
- SITC of SS304 pipes for compressed dry air network
- Phase 1 Central Utilities Building commissioned & handed over to client
- Semiconductor factory level compliances & protocols maintained
- Project Cost – 17 Cr